Kryton Smart Concrete® INTEGRAL WATERPROOFING & DURABILITY SOLUTIONS
b
  • English
  • Spanish
  • India
  • China
  • Products
    • Krystol® Technology
    • Smart Concrete®
    • Admixtures & Additives
      • Krystol Internal Membrane™ (KIM®)
      • Hard-Cem®
      • Con-Fume®
      • Krystol Mortar Admixture™ (KMA)
    • Surface Applied Waterproofing
      • Krystol Broadcast™
      • Krystol T1® Concrete Waterproofing
      • Hydrostop™ Sealer
    • Construction Joints & Details
      • Krystol Waterstop Grout™
      • Krystol Waterstop Treatment™
      • Krytonite™ Swelling Waterstop
      • Crack Inducing Waterstop
    • Concrete Repairs
      • Krystol Leak Repair System
      • Krystol Repair Grout™
      • Krystol Bari-Cote™
    • Concrete Monitoring
    • Standard Warranty
    • Krystol Assurance Program™ (KAP)
  • Case Studies
  • Resources
    • Information for Owners/Developers
    • Information for Architects
    • Information for Engineers
    • Information for General Contractors
    • Information for Concrete Producers
    • Technical Info
      • Application Overviews
      • Application Instructions
      • Specifications
      • Technical Data Sheets
      • Safety Data Sheets
      • CAD Drawings
      • Testing & Certification
      • LEED
    • Courses
    • Brochures
    • Videos
  • Sustainability
  • About
    • Why Kryton
    • Leadership
    • Our Values
    • Kryton History
    • Testimonials
    • News
    • Blog
    • Careers
      • Life as Krytonite
      • Current Positions
  • Find a Distributor
  • Become a Distributor
  • Regions
    • Spanish – Español
    • India – English
    • China – 简体字

New Construction

  1. <
  2. 1
  3. ...
  4. 15
  5. 16
  6. 17
  7. 18
  8. 19
  9. 20
  10. 21
  11. 22
  12. >

Insurance Company Croatia Osiguranje

September 19, 2000

Background At the construction site of Croatia Osiguranje, the underground water level was very high. The pumps were working at all times during the construction phase of the underground garage which measured 2 x 2600 meters squared.  Solution By using Kryton’s Krystol Waterproofing System, the entire underground garage was protected from intruding water. Based on … Read More

Kryton > Projects

BMW Building

November 1, 1999

Background Krystol Internal Membrane (KIM) was used in the concrete mix of the the 200 cubic meters deck slab on the rooftop car park of the BMW Building in Southbank, Melbourne. Solution KIM is a cementitious admixture added to the concrete to provide permanent self-sealing waterproofing. KIM uses Kryton’s proprietary crystalline technology to react with … Read More

Kryton > Projects

Water Reclamation Plant

October 21, 1999

Background Part of a network of water treatment plants, the Seletar Water Reclamation Plant is a key component in Singapore's plan to become self-sufficient in the production of fresh water. The Seletar plant processes nearly 250,000 cubic meters (327,000 cubic yards) per day of wastewater from the city's sewers. This high-quality water can be mixed … Read More

Kryton > Projects

Above-Grade Water Containment Tank

September 21, 1999

Background Constructability and cost effectiveness were key concerns for engineers on the above ground tank built in Norwalk, Connecticut. Built indoors to supply water in case of fire emergencies to a large retail mall and a health spa. The water containment tank was built approximately 6 meters (20 feet) high, 9 meters (30 feet) wide and … Read More

Kryton > Projects

Sibelco Silica-Sand Silo

September 24, 1998

Background The Sibelco Silica-sand silo in Jakarta required a waterproofing system that would protect the contents of its silos from moisture. Wet Silica-sand adds significant cost and inefficiency to their business. The Silica-sand within the silo must be kept 100% dry. Solution In 1998, Krystol T1 & T2 system were utilized to waterproof the suspended … Read More

Kryton > Projects

Mrazovka Tunnel

September 22, 1998

Background In 1998 the City of Prague began construction on a connecting bridge to one of the most important tunnels in the Czech Republic, the Tunnel Mrazovka, which is part of the speedway that rings Prague. The city required materials that would enhance concrete beyond its natural capability for reduced cracking and resistance to water … Read More

Kryton > Projects

Residential Building

September 21, 1998

Background The water table in Croatia is very high and traditionally concrete homes have problems with water penetration. As well, Croatia undergoes dramatic weather cycles, resulting in many problems with water seepage. Code requirements call for a roof membrane. However, in September, 1998 the first waterproof home was built in Europe without an exterior membrane … Read More

Kryton > Projects

Bode’s Precast Water and Septic Tanks

October 22, 1997

Background Bode’s Precast Inc. is a precast concrete manufacturer of septic tanks, drinking water containment tanks and tanks specifically for the agricultural sector. Their products are widely used by residential and commercial contractors and owners throughout the Whatcom, Skagit and Island Counties of Washington State, USA. Containment tanks are built in sizes ranging from 4700 … Read More

Kryton > Projects

Park Hyatt Hotel

October 19, 1997

Background The complex at Cathedral Place has five (5) levels of underground parking. The structure was designed to extend to each of the site boundaries and conventional tanking of the building could not be considered. The use of Kryton's Krystol Internal Membrane (KIM) for tanking the building allowed maximum use of the available site as … Read More

Kryton > Projects

Parking Deck Raft Slab

September 19, 1997

Background A 3,250 square meter (35,000 square foot) parking deck raft slab required waterproofing and corrosion resistance. The raft slab was on grade but the property is situated below sea level. Engineers were concerned about wicking water and subsequent corrosion of reinforcing steel. As well there were virtually no joints or construction breaks to alleviate stress and … Read More

Kryton > Projects
  1. <
  2. 1
  3. ...
  4. 15
  5. 16
  6. 17
  7. 18
  8. 19
  9. 20
  10. 21
  11. 22
  12. >

Latest Tweet

We were excited to kick off 2023 with our long-anticipated POWERUP 2023 event in Las Vegas last month.… https://t.co/PH7k0tYRpg
3 days ago

Kryton Concrete Blog Kryton on Facebook Kryton on Twitter Kryton on LinkedIn Kryton on YouTube

Subscribe to our eNewsletter

Stay connected and subscribe to get the latest news. You can unsubscribe at any time.

"*" indicates required fields

By submitting the form, you agree to our Terms and Conditions and Privacy Policy

Terms of Use Privacy Policy Distributor Portal
Toll Free: +1.800.267.8280 Tel: +1.604.324.8280 Email us

Corporate Headquarters: 1645 East Kent Avenue, Vancouver, British Columbia, V5P 2S8 Canada

Calgary (Cementec): 13 Industry Way SE, Calgary, Alberta T3S 0A2 Canada

China: Room 1012, Block B, Tongzhou Wanda Plaza, No. 58, Xinhua West Street, Tongzhou District, Beijing

India (Kryton Buildmat Co. Pvt.): 136-137 Centrum Plaza, Golf Course Road, Sector 53, Gurgaon Haryana 122002

©2023 Kryton International Inc.