Kryton Smart Concrete® INTEGRAL WATERPROOFING & DURABILITY SOLUTIONS
b
  • English
  • Spanish
  • India
  • China
  • Products
    • Krystol® Technology
    • Smart Concrete®
    • Admixtures & Additives
      • Krystol Internal Membrane™ (KIM®)
      • Hard-Cem®
      • Con-Fume®
      • Krystol Mortar Admixture™ (KMA)
    • Surface Applied Waterproofing
      • Krystol Broadcast™
      • Krystol T1® Concrete Waterproofing
      • Hydrostop™ Sealer
    • Construction Joints & Details
      • Krystol Waterstop Grout™
      • Krystol Waterstop Treatment™
      • Krytonite™ Swelling Waterstop
      • Crack Inducing Waterstop
    • Concrete Repairs
      • Krystol Leak Repair System
      • Krystol Repair Grout™
      • Krystol Bari-Cote™
    • Concrete Monitoring
    • Standard Warranty
    • Krystol Assurance Program™ (KAP)
  • Case Studies
  • Resources
    • Information for Owners/Developers
    • Information for Architects
    • Information for Engineers
    • Information for General Contractors
    • Information for Concrete Producers
    • Technical Info
      • Application Overviews
      • Application Instructions
      • Specifications
      • Technical Data Sheets
      • Safety Data Sheets
      • CAD Drawings
      • Testing & Certification
      • LEED
    • Courses
    • Brochures
    • Videos
  • Sustainability
  • About
    • Why Kryton
    • Leadership
    • Our Values
    • Kryton History
    • Testimonials
    • News
    • Blog
    • Careers
      • Life as Krytonite
      • Current Positions
  • Find a Distributor
  • Become a Distributor
  • Regions
    • Spanish – Español
    • India – English
    • China – 简体字

New Construction

  1. <
  2. 1
  3. ...
  4. 15
  5. 16
  6. 17
  7. 18
  8. 19
  9. 20
  10. 21
  11. 22
  12. >

Habtoor Grand Hotel Convention Center & Spa

October 23, 2001

Background On the eastern side of Beirut, the 5-star Habtoor Grand Hotel Convention Center & Spa was constructed in 2001 and still stands as one of the most prestigious and successful hotels in Lebanon. The Al Habtoor Group, owner and operator of hotels throughout the Middle East, has a very high standard of quality for … Read More

Kryton > Projects

Skarholmen Parking Deck

October 19, 2001

Background High amount of chlorides in the parking stalls and main slabs due to salts and chlorides brought in by cars during the winter caused severely damaged concrete. Solution One section of a suspended slab, 600 squared meters (6,500 square feet), was completely removed and Krystol Internal Membrane (KIM) was added to the new concrete … Read More

Kryton > Projects

Bayside Grand Apartments

October 2, 2000

Background Over 300 cubic meters of Krystol Internal Membrane (KIM) was used in the construction of all balconies and roof slabs of the Bayside Grand Apartments on Phillip Island, Victoria. Solution KIM is a cementitious admixture added to the concrete to provide permanent waterproofing, and replaces the need for any external waterproofing, such as membranes. KIM … Read More

Kryton > Projects

SEA LIFE Melbourne Aquarium

September 23, 2000

Background Underwater aquarium’s are some of the most craved and attended attractions the world over. From dolphin’s flipping about in the air, to a large Orca splashing the excited crowd, seemingly in appreciation for their attendence, people flock to the spectacle. However, there is plenty of work that goes into a venue of this nature … Read More

Kryton > Projects

Mundo Marino S.A. Oceanarium

September 23, 2000

Background Mundo Marino S.A. is one of South America’s largest marine parks and the only aquarium on the continent that houses Orcas. At more than 31 meters (100 feet) in diameter, 5 meters (16 feet) deep and with a volume of 3.55 million liters (940,000 gallons), the main aquarium pool at Mundo Marino S.A. is … Read More

Kryton > Projects

Shanghai Subway

September 22, 2000

Background Different sections in the stations for the new subway line in Shanghai faced problems due to sulfate attack, chloride penetration and corrosion. An effective waterproofing system and a watertight corrosion free concrete solution were needed to overcome these problems. The system had to provide cost effective quality and low cost maintenance while performing without … Read More

Kryton > Projects

Argentina Pedestrian Tunnel

September 22, 2000

Background A pedestrian walking tunnel in a very busy, industrial area of Buenos Aires required a waterproofing system for the concrete that would last many years. There was particular concern over the aggressive contaminants in the ground water common to the area. Solution The Krystol Internal Membrane (KIM) admixture was supplied by Kryton’s Argentinian distributor, … Read More

Kryton > Projects

Argentina Wastewater Treatment Plant

September 22, 2000

Background The Cooperative de Obras Y Servicios Publicos de Santa Teresita made Kryton's Argentinean distributor a key contributor to the construction of a local wastewater treatment plant. The plant is designed to have capacity for 100,000 inhabitants and to service the local regions of Santa Teresita, de Mar del Tuyu, and Parti do de la … Read More

Kryton > Projects

Hyatt Hotel & Sheraton Hotel Pools

September 22, 2000

Background Concrete pools and spas on the 17th floor of the Hyatt Hotel and on the 3rd floor of the Sheraton Hotel in Calgary are situated over guest rooms.  During specification and construction it was recognized that these aquatic centers demanded high performance, permanent waterproofing to remove the threat of leakage. Solution Krystol Internal Membrane … Read More

Kryton > Projects

St. Kilda Beach

September 19, 2000

Background A major concern to engineers working on the St. Kilda Beach parkade is the structure's proximity to salt water, groundwater soluble contamination and the potential for rebar corrosion in the concrete. The parkade will accomodate 460 cars on two levels and is designed to be well below grade. The top side of the parkade … Read More

Kryton > Projects
  1. <
  2. 1
  3. ...
  4. 15
  5. 16
  6. 17
  7. 18
  8. 19
  9. 20
  10. 21
  11. 22
  12. >

Latest Tweet

We were excited to kick off 2023 with our long-anticipated POWERUP 2023 event in Las Vegas last month.… https://t.co/PH7k0tYRpg
3 days ago

Kryton Concrete Blog Kryton on Facebook Kryton on Twitter Kryton on LinkedIn Kryton on YouTube

Subscribe to our eNewsletter

Stay connected and subscribe to get the latest news. You can unsubscribe at any time.

"*" indicates required fields

By submitting the form, you agree to our Terms and Conditions and Privacy Policy

Terms of Use Privacy Policy Distributor Portal
Toll Free: +1.800.267.8280 Tel: +1.604.324.8280 Email us

Corporate Headquarters: 1645 East Kent Avenue, Vancouver, British Columbia, V5P 2S8 Canada

Calgary (Cementec): 13 Industry Way SE, Calgary, Alberta T3S 0A2 Canada

China: Room 1012, Block B, Tongzhou Wanda Plaza, No. 58, Xinhua West Street, Tongzhou District, Beijing

India (Kryton Buildmat Co. Pvt.): 136-137 Centrum Plaza, Golf Course Road, Sector 53, Gurgaon Haryana 122002

©2023 Kryton International Inc.