Kryton Smart Concrete® INTEGRAL WATERPROOFING & DURABILITY SOLUTIONS
b
  • English
  • Spanish
  • India
  • China
  • Products
    • Krystol® Technology
    • Smart Concrete®
    • Admixtures & Additives
      • Krystol Internal Membrane™ (KIM®)
      • Hard-Cem®
      • Con-Fume®
      • Krystol Mortar Admixture™ (KMA)
    • Surface Applied Waterproofing
      • Krystol Broadcast™
      • Krystol T1® Concrete Waterproofing
      • Hydrostop™ Sealer
    • Construction Joints & Details
      • Krystol Waterstop Grout™
      • Krystol Waterstop Treatment™
      • Krytonite™ Swelling Waterstop
      • Crack Inducing Waterstop
    • Concrete Repairs
      • Krystol Leak Repair System
      • Krystol Repair Grout™
      • Krystol Bari-Cote™
    • Concrete Monitoring
    • Standard Warranty
    • Krystol Assurance Program™ (KAP)
  • Case Studies
  • Resources
    • Information for Owners/Developers
    • Information for Architects
    • Information for Engineers
    • Information for General Contractors
    • Information for Concrete Producers
    • Technical Info
      • Application Overviews
      • Application Instructions
      • Specifications
      • Technical Data Sheets
      • Safety Data Sheets
      • CAD Drawings
      • Testing & Certification
      • LEED
    • Courses
    • Brochures
    • Videos
  • Sustainability
  • About
    • Why Kryton
    • Leadership
    • Our Values
    • Kryton History
    • Testimonials
    • News
    • Blog
    • Careers
      • Life as Krytonite
      • Current Positions
  • Find a Distributor
  • Become a Distributor
  • Regions
    • Spanish – Español
    • India – English
    • China – 简体字

New Construction

  1. <
  2. 1
  3. ...
  4. 15
  5. 16
  6. 17
  7. 18
  8. 19
  9. 20
  10. 21
  11. 22
  12. >

Shaw Tower Parkade

October 19, 2004

Background The 3,000 cubic metres (3900 cubic yards) of concrete placed for the huge raft slab foundation of the Shaw Tower set the record for the largest continuous pour in the history of Vancouver. When complete the tower will stand at 149 metres (490 feet) tall. More than 38,000 cubic metres (50,000 cubic yards) of … Read More

Kryton > Projects

Republic Polytechnic – Woodlands Campus

September 21, 2004

Background Republic Polytechnic is a post-secondary institution that began construction of their new Woodlands Campus in 2004, which would serve thousands of students and community members. The 20 hectare Woodlands Campus is made up of a central nucleus containing 11 identical, high-rise learning pods that are linked by two large, elliptical concrete decks of common … Read More

Kryton > Projects

The House on the Hill

August 21, 2004

Background Located in the northern Puget Sound area of Washington State, the House on the Hill was specifically designed to complement its natural surroundings, including a grove of 200-year-old cedar trees. Constructed of ready-mix concrete, the home blends seamlessly with its environment and the concrete’s natural color is enhanced by the surrounding landscaping and rockwork. … Read More

Kryton > Projects

Metro Skate Park

June 1, 2004

Winning Several Awards for Its High-Quality, Durable Concrete Design Background Skate parks have much to offer to the cities that are willing to accept them. In fact, according to a number of researchers, these places can help reduce crime levels and childhood obesity in their surrounding areas. They can also give skateboarders a space where … Read More

Kryton > Projects

TreePeople Center Underground Cistern

October 21, 2003

Background Winner! 2011 Project of the Year: GreenSite Awards This projected was selected as the Judge’s Choice for the Project of the Year under the Industrial category. Based in Los Angeles, California, TreePeople is a non–profit organization that addresses urban issues such as water and energy conservation, flood prevention and storm water pollution. The TreePeople Center … Read More

Kryton > Projects

Orlando International Airport

October 19, 2003

Background Many of the estimated 28.9 million people (approximately 79 000 daily) that visit the Orlando International Airport each year utilize the airport’s parking facilities. In recent years, however, increased traffic has created a bottleneck at the four access points that carry visitors from the parking garages into the terminal. To improve traffic flow, the … Read More

Kryton > Projects

Intrawest Sandestin Golf Resort

October 19, 2003

Background Protecting the parking lot below from possible leakage from these water systems was imperative. Solution To reinforce and supplement conventional waterproofing systems, Intrawest utilized Krystol Internal Membrane (KIM) and the KIM Waterstop joint design system to seal and waterproof the water systems. KIM was added to the concrete pour for the roof slab and … Read More

Kryton > Projects

Northfield Wastewater Tank

September 22, 2003

Background Several years ago, the City of Northfield, MN faced several challenges with its wastewater treatment plant. The Northfield Wastewater Treatment Facility, which serves the cities of Northfield and Dundas, had virtually outgrown its existing space. The plant was located on a small peninsula on Minnesota’s Cannon River, meaning there was virtually no space available … Read More

Kryton > Projects

Precast Water and Septic Tanks

October 22, 2002

Background SPS Septic Precast Specialties Inc. is a precast company specializing in septic tanks, grease traps, dosing tanks and pump tanks for the commercial and residential markets in Atlanta, GA. SPS is a progressive company that understands the need for improved environmental performance. SPS began testing of Krystol Concrete Waterproofing Systems in July 2002. Tanks are … Read More

Kryton > Projects

Palm Islands

September 21, 2002

Background The Palm Islands are the three largest man-made islands in the world. Construction on the “Eighth Wonder of the World” began in May, 2002 off the coast of Dubai. It is expected to be one of the world’s top tourist destinations. Each of the islands (Palm Jumeirah, Palm Jebel Ali, and Palm Deira) are … Read More

Kryton > Projects
  1. <
  2. 1
  3. ...
  4. 15
  5. 16
  6. 17
  7. 18
  8. 19
  9. 20
  10. 21
  11. 22
  12. >

Latest Tweet

We were excited to kick off 2023 with our long-anticipated POWERUP 2023 event in Las Vegas last month.… https://t.co/PH7k0tYRpg
3 days ago

Kryton Concrete Blog Kryton on Facebook Kryton on Twitter Kryton on LinkedIn Kryton on YouTube

Subscribe to our eNewsletter

Stay connected and subscribe to get the latest news. You can unsubscribe at any time.

"*" indicates required fields

By submitting the form, you agree to our Terms and Conditions and Privacy Policy

Terms of Use Privacy Policy Distributor Portal
Toll Free: +1.800.267.8280 Tel: +1.604.324.8280 Email us

Corporate Headquarters: 1645 East Kent Avenue, Vancouver, British Columbia, V5P 2S8 Canada

Calgary (Cementec): 13 Industry Way SE, Calgary, Alberta T3S 0A2 Canada

China: Room 1012, Block B, Tongzhou Wanda Plaza, No. 58, Xinhua West Street, Tongzhou District, Beijing

India (Kryton Buildmat Co. Pvt.): 136-137 Centrum Plaza, Golf Course Road, Sector 53, Gurgaon Haryana 122002

©2023 Kryton International Inc.