Kryton Smart Concrete® INTEGRAL WATERPROOFING & DURABILITY SOLUTIONS
b
  • English
  • Spanish
  • India
  • China
  • Products
    • Krystol® Technology
    • Smart Concrete®
    • Admixtures & Additives
      • Krystol Internal Membrane™ (KIM®)
      • Hard-Cem®
      • Con-Fume®
      • Krystol Mortar Admixture™ (KMA)
    • Surface Applied Waterproofing
      • Krystol Broadcast™
      • Krystol T1® Concrete Waterproofing
      • Hydrostop™ Sealer
    • Construction Joints & Details
      • Krystol Waterstop Grout™
      • Krystol Waterstop Treatment™
      • Krytonite™ Swelling Waterstop
      • Crack Inducing Waterstop
    • Concrete Repairs
      • Krystol Leak Repair System
      • Krystol Repair Grout™
      • Krystol Bari-Cote™
    • Concrete Monitoring
    • Standard Warranty
    • Krystol Assurance Program™ (KAP)
  • Case Studies
  • Resources
    • Information for Owners/Developers
    • Information for Architects
    • Information for Engineers
    • Information for General Contractors
    • Information for Concrete Producers
    • Technical Info
      • Application Overviews
      • Application Instructions
      • Specifications
      • Technical Data Sheets
      • Safety Data Sheets
      • CAD Drawings
      • Testing & Certification
      • LEED
    • Courses
    • Brochures
    • Videos
  • Sustainability
  • About
    • Why Kryton
    • Leadership
    • Our Values
    • Kryton History
    • Testimonials
    • News
    • Blog
    • Careers
      • Life as Krytonite
      • Current Positions
  • Find a Distributor
  • Become a Distributor
  • Regions
    • Spanish – Español
    • India – English
    • China – 简体字

New Construction

  1. <
  2. 1
  3. ...
  4. 14
  5. 15
  6. 16
  7. 17
  8. 18
  9. 19
  10. 20
  11. 21
  12. 22
  13. >

Singapore Condominium Projects

January 17, 2006

Background Since 2004, Lee Construction Pte Ltd. has waterproofed numerous high-profile condominium projects in Singapore – more than anywhere else in the world – using Kryton International’s Krystol Internal Membrane (KIM) admixture. Solution When added directly to fresh concrete, KIM’s crystalline chemicals, millions of needle-like crystals, grow and fill all pores and capillaries of the … Read More

Kryton > Projects

Private Residence

September 23, 2005

Background The County of Donegal is located on Ireland’s most northerly point and is the home to some of Ireland’s most amazing scenery, ranging from high mountains, rivers, lakes, to coastal cliffs and beaches.  Glencolmcille is a small town in this county located close to the Atlantic Ocean. The contractors’ main concern when building this … Read More

Kryton > Projects

Shinsegae Tunnel

September 22, 2005

Background One of Korea’s largest retail establishments, Shinsegae Co., Ltd. recently constructed its new flagship store in Seoul’s upscale Myongdong commercial district. As part of the renovations, a 60 meter (196.8 feett) pedestrian tunnel was built to connect the Shinsegae retail store to the Hoehyun Subway Station, and a 20-meter (65.6 feet) passageway was created to link … Read More

Kryton > Projects

St. Petersburg Wastewater Treatment Plant

September 22, 2005

Background Home to more than five million people, the city of St. Petersburg, Russia has traditionally been one of the Baltic region’s greatest sources of pollution. However, by reducing the amount of untreated wastewater being released into the Baltic Sea by 50 per cent, the city’s new Southwest Wastewater Treatment Plant will significantly improve the … Read More

Kryton > Projects

Thalaso Terapija

September 21, 2005

Background At the Thalaso Terapija construction site, the construction team noted that mounting, flushing water did not cause the problem with flooding inside the building. The team selected Kryton International’s Krystol waterproofing system. The Krystol products were used to prevent water coming inside the concrete structure. The success was above everyone’s expectations. Solution Standard procedure … Read More

Kryton > Projects

Island Honda Dealership Facility

April 7, 2005

Background Island Honda has been selling and servicing vehicles in the Comox Valley since 1986, and it’s been growing since then. Due to this growth, Island Honda needed their construction team to build a larger modern facility that would meet the needs of an increasing business that was aiming to accommodate its sales, service, and … Read More

Kryton > Projects

Squamish Hydro Dam

April 7, 2005

Background In conjunction with BC Hydro, Canadian Hydro Developers started the construction of a concrete dam in 2004 to help the Squamish, British Columbia, area generate electricity. This dam was designed to act as an independent power plant, and its bottom 4 m needed enough durability to protect the concrete from the highly erosive forces … Read More

Kryton > Projects

Knowledge Village Office Building

February 13, 2005

Background Dubai has long been the pre-eminent business center in the United Arab Emirates. Its geographical proximity, cultivation of innovation, as well as its sophisticated logistical infrastructure between Europe and the Far East makes it the location of choice for much business in the region. Knowledge Village is an upscale area in Dubai located very … Read More

Kryton > Projects

Crowne Plaza Hotel

October 21, 2004

Background Quality and aesthetic value of a building structure means everything in the hospitality industry. In the business district of Gurgaon, a new 5-star hotel was to be constructed starting November 2004, with plans to have the facilities operational at the earliest. Today Hotels Pvt. Ltd., a developer of both residential and commercial real estate … Read More

Kryton > Projects

Al-Falak Residential Building

October 21, 2004

Background The Al-Falak building is a residential/commercial building in Dammam, Saudi Arabia. When investigating waterproofing options for the building's below grade slab, walls and water tank, the project team knew they needed a system that was cost-effective and low-maintenance. However, their search was made more complicated by a number of factors. First, the area's soil … Read More

Kryton > Projects
  1. <
  2. 1
  3. ...
  4. 14
  5. 15
  6. 16
  7. 17
  8. 18
  9. 19
  10. 20
  11. 21
  12. 22
  13. >

Latest Tweet

We were excited to kick off 2023 with our long-anticipated POWERUP 2023 event in Las Vegas last month.… https://t.co/PH7k0tYRpg
3 days ago

Kryton Concrete Blog Kryton on Facebook Kryton on Twitter Kryton on LinkedIn Kryton on YouTube

Subscribe to our eNewsletter

Stay connected and subscribe to get the latest news. You can unsubscribe at any time.

"*" indicates required fields

By submitting the form, you agree to our Terms and Conditions and Privacy Policy

Terms of Use Privacy Policy Distributor Portal
Toll Free: +1.800.267.8280 Tel: +1.604.324.8280 Email us

Corporate Headquarters: 1645 East Kent Avenue, Vancouver, British Columbia, V5P 2S8 Canada

Calgary (Cementec): 13 Industry Way SE, Calgary, Alberta T3S 0A2 Canada

China: Room 1012, Block B, Tongzhou Wanda Plaza, No. 58, Xinhua West Street, Tongzhou District, Beijing

India (Kryton Buildmat Co. Pvt.): 136-137 Centrum Plaza, Golf Course Road, Sector 53, Gurgaon Haryana 122002

©2023 Kryton International Inc.