Kryton Smart Concrete® INTEGRAL WATERPROOFING & DURABILITY SOLUTIONS
b
  • English
  • Spanish
  • India
  • China
  • Products
    • Krystol® Technology
    • Smart Concrete®
    • Admixtures & Additives
      • Krystol Internal Membrane™ (KIM®)
      • Hard-Cem®
      • Con-Fume®
      • Krystol Mortar Admixture™ (KMA)
    • Surface Applied Waterproofing
      • Krystol Broadcast™
      • Krystol T1® Concrete Waterproofing
      • Hydrostop™ Sealer
    • Construction Joints & Details
      • Krystol Waterstop Grout™
      • Krystol Waterstop Treatment™
      • Krytonite™ Swelling Waterstop
      • Crack Inducing Waterstop
    • Concrete Repairs
      • Krystol Leak Repair System
      • Krystol Repair Grout™
      • Krystol Bari-Cote™
    • Concrete Monitoring
    • Standard Warranty
    • Krystol Assurance Program™ (KAP)
  • Case Studies
  • Resources
    • Information for Owners/Developers
    • Information for Architects
    • Information for Engineers
    • Information for General Contractors
    • Information for Concrete Producers
    • Technical Info
      • Application Overviews
      • Application Instructions
      • Specifications
      • Technical Data Sheets
      • Safety Data Sheets
      • CAD Drawings
      • Testing & Certification
      • LEED
    • Courses
    • Brochures
    • Videos
  • Sustainability
  • About
    • Why Kryton
    • Leadership
    • Our Values
    • Kryton History
    • Testimonials
    • News
    • Blog
    • Careers
      • Life as Krytonite
      • Current Positions
  • Find a Distributor
  • Become a Distributor
  • Regions
    • Spanish – Español
    • India – English
    • China – 简体字

New Construction

  1. <
  2. 1
  3. ...
  4. 13
  5. 14
  6. 15
  7. 16
  8. 17
  9. 18
  10. 19
  11. 20
  12. 21
  13. 22
  14. >

Kaiser Permanente Sunnyside Medical Center

October 19, 2007

Protecting the Parking for the Top Teaching Hospital in Oregon Background During 2018, the Kaiser Permanente Sunnyside Medical Center was recognized as Oregon’s top teaching hospital and fifth best hospital overall by hospital watchdog Leapfrog Group. However, this couldn’t have been accomplished without first having the space to accommodate everyone in need. Before 2007, they … Read More

Kryton > Projects

Vancouver Airport (YVR) Aquarium

September 23, 2007

Background Vancouver International Airport (YVR) is undergoing a $200-million expansion of the International Terminal. To give the project a British Columbia outdoors feel, a man-made stream runs from the new aircraft gates through the centre of the building. At the end of the stream, a huge aquarium has been installed featuring native BC sea life … Read More

Kryton > Projects

Vancouver International Airport (YVR) Airport Tunnel

September 22, 2007

Background Vancouver International Airport (YVR) is Canada’s second busiest airport and North America’s second largest international passenger gateway on the West Coast with over 16 million passengers each year. YVR is located in Richmond, a suburb of Vancouver, at the mouth of the Fraser River, where the highest land point elevation is 1.8 meter (six … Read More

Kryton > Projects

Sakura Hot Spring Hotel

September 21, 2007

Background Taiwan has a sub-tropical climate with sudden rain showers frequently occurring. This constant dampness proves to be a waterproofing challenge in new construction, especially along coastal areas that are already below sea-level. Construction of the Sakura Hot Spring Hotel started in January 2007, with completion expected by October 2007. The boutique hotel will feature … Read More

Kryton > Projects

KK Times Square

September 21, 2007

Background Dubbed Kota Kinabalu’s largest ever urban commercial project, KK Times Square is a sprawling, 93,000 square meters (23-acre) development designed to accommodate the city’s expanding commercial activities. Comprised of a combination of office and retail facilities and public spaces, KK Times Square offers shopping, dining, entertainment and leisure activities for Kota Kinabalu residents and … Read More

Kryton > Projects

Naviduct Shiplock Floor

August 24, 2007

Background The Krabbersgat-locks at Enkhuizen are the Netherlands’ busiest recreation locks. This unique structure is called a Naviduct and is the world’s first and only combination of an aqueduct and a ship lock. Because the bridge, located in the Enkhuizen-Lelystad dike, has to be opened for almost every ship, long waiting times are a regular … Read More

Kryton > Projects

Couples Swept Away Resort

October 21, 2006

Background The “Couples Swept Away” Resort is a 312 room luxury hotel located along Negril’s pristine seven-mile (11 kilometer) beach. A popular honeymooner destination, the Couples Swept Away Resort is a tucked away paradise. Its desirable location along the Caribbean coast not only tempts tourists from all over the world, it also means that the … Read More

Kryton > Projects

Horizon Tower

October 21, 2006

Background The Horizon Tower is a $28 million, two block development offering residential suites on 18 floors in a luxurious building. It is located in the heart of the old, prestigious “Ein El Mraiseh” seafront. The main Contractor of this project was concerned about possible leakage from two suspended roof pools. The Contractor has successfully … Read More

Kryton > Projects

Manukau Police Hub Tunnel

September 22, 2006

Background New Zealand’s Manukau region is the busiest police district in the country. When considering the design of their new headquarters, the New Zealand Police knew that they needed to take advantage of the proximity of the site to the Courthouse which was directly across the street. With both facilities expected to be stressed beyond … Read More

Kryton > Projects

Museo Del Centro Cultural Polyforum

September 22, 2006

Background Due to high demand from the community the Cultural Institute of Leon, Guanajuato, Mexico worked with local fine arts and cultural community members to create the MUSEO DEL CENTRO CULTURAL POLYFORUM (Cultural Museum). Located in the Bajio heart, the city of Leon (population of about 800 000) is situated in a fertile river valley. … Read More

Kryton > Projects
  1. <
  2. 1
  3. ...
  4. 13
  5. 14
  6. 15
  7. 16
  8. 17
  9. 18
  10. 19
  11. 20
  12. 21
  13. 22
  14. >

Latest Tweet

We were excited to kick off 2023 with our long-anticipated POWERUP 2023 event in Las Vegas last month.… https://t.co/PH7k0tYRpg
3 days ago

Kryton Concrete Blog Kryton on Facebook Kryton on Twitter Kryton on LinkedIn Kryton on YouTube

Subscribe to our eNewsletter

Stay connected and subscribe to get the latest news. You can unsubscribe at any time.

"*" indicates required fields

By submitting the form, you agree to our Terms and Conditions and Privacy Policy

Terms of Use Privacy Policy Distributor Portal
Toll Free: +1.800.267.8280 Tel: +1.604.324.8280 Email us

Corporate Headquarters: 1645 East Kent Avenue, Vancouver, British Columbia, V5P 2S8 Canada

Calgary (Cementec): 13 Industry Way SE, Calgary, Alberta T3S 0A2 Canada

China: Room 1012, Block B, Tongzhou Wanda Plaza, No. 58, Xinhua West Street, Tongzhou District, Beijing

India (Kryton Buildmat Co. Pvt.): 136-137 Centrum Plaza, Golf Course Road, Sector 53, Gurgaon Haryana 122002

©2023 Kryton International Inc.