Kryton Smart Concrete® INTEGRAL WATERPROOFING & DURABILITY SOLUTIONS
b
  • English
  • Spanish
  • India
  • China
  • Products
    • Krystol® Technology
    • Smart Concrete®
    • Admixtures & Additives
      • Krystol Internal Membrane™ (KIM®)
      • Hard-Cem®
      • Con-Fume®
      • Krystol Mortar Admixture™ (KMA)
    • Surface Applied Waterproofing
      • Krystol Broadcast™
      • Krystol T1® Concrete Waterproofing
      • Hydrostop™ Sealer
    • Construction Joints & Details
      • Krystol Waterstop Grout™
      • Krystol Waterstop Treatment™
      • Krytonite™ Swelling Waterstop
      • Crack Inducing Waterstop
    • Concrete Repairs
      • Krystol Leak Repair System
      • Krystol Repair Grout™
      • Krystol Bari-Cote™
    • Concrete Monitoring
    • Standard Warranty
    • Krystol Assurance Program™ (KAP)
  • Case Studies
  • Resources
    • Information for Owners/Developers
    • Information for Architects
    • Information for Engineers
    • Information for General Contractors
    • Information for Concrete Producers
    • Technical Info
      • Application Overviews
      • Application Instructions
      • Specifications
      • Technical Data Sheets
      • Safety Data Sheets
      • CAD Drawings
      • Testing & Certification
      • LEED
    • Courses
    • Brochures
    • Videos
  • Sustainability
  • About
    • Why Kryton
    • Leadership
    • Our Values
    • Kryton History
    • Testimonials
    • News
    • Blog
    • Careers
      • Life as Krytonite
      • Current Positions
  • Find a Distributor
  • Become a Distributor
  • Regions
    • Spanish – Español
    • India – English
    • China – 简体字

Shotcrete

  1. 1
  2. 2
  3. >

The Independent at Main

October 5, 2019

Extending a Building’s Life Span with Self-Sealing Waterproof Concrete Background A new luxury apartment tower and townhome complex with 258 units was fully built in Vancouver’s Mount Pleasant neighborhood in 2019. The 21-story mixed-use development boasts a 2,044-square meter (22,000-square foot) shared backyard that was designed to foster a sense of community. To provide this … Read More

Kryton > Projects

Domino Sugar Refinery Redevelopment

May 29, 2016

Providing Proper Waterproofing and Consultative Guidance Background Once known as a sugar refinery, this Domino redevelopment project integrates many of the historic features found in its previous iteration. Considered to be a megaproject, the redevelopment, alongside the new quarter-mile of the nearby Williamsburg waterfront, has been designed to transform the surrounding dilapidated area into a … Read More

Kryton > Projects
The MOTIONGATE Dubai theme park is lit up all in lights with the DreamWorks Animation section at the very top of the layout, which has a path that leads to a large swimming area at the bottom of the layout.

MOTIONGATE Dubai Theme Park

May 19, 2016

Providing Dubai’s Popular Park with Warrantied Waterproofing Background From an indoor skiing and snowboarding facility to the world’s tallest building, the construction landscape in Dubai has always been pushing the limits of the built environment. It has attracted millions of tourists from all over the world, and to maintain that global attraction, Dubai set its … Read More

Kryton > Projects
TELUS Garden being built in a sunny day in the year 2014

TELUS Garden

January 23, 2015

Ensuring TELUS Garden’s Watertight LEED Platinum and Gold Certifications Background TELUS Garden is an exceptional $750-million, 92,903-square meter (1,000,000-square foot) project. It features a 53-floor residential tower that possesses a 1,393.5-square meter (15,000-square foot) space for amenities. The project also includes a 24-floor signature office tower that serves as TELUS Communications’ new national headquarters in … Read More

Kryton > Projects
La Capital nestled along Monterrey's prestine canal.

La Capital

November 5, 2014

Making Waterproofing with Shotcrete So Much Simpler Background La Capital is a multi-use building that displays distinctly modern urban architectural features, which still pay respect to the legacy of Monterrey’s history and culture. To add to this atmosphere, the building is surrounded by underground springs and caves. While atmospheric, these natural formations come with a … Read More

Kryton > Projects

Double Tree by Hilton

September 29, 2014

Background From the Burj Khalifa to the Mall of the Emirates, each structure defining Dubai’s skyline is remarkable. The DoubleTree by Hilton Hotel & Residences – Al Barsha is no exception. The features for this hotel are consistent with the Hilton brand worldwide – everything is top of theline. The hotel boasts 181 modern rooms, … Read More

Kryton > Projects

Riverport Flats

October 17, 2012

Background The Riverport Flats are luxury rental apartments built in the south-end of Richmond, BC. Located on a river delta just one meter above sea level the area is prone to flooding. Because of the high water table and the waterfront location waterproofing was a major challenge for this project. Solution Traditional externally applied membranes … Read More

Kryton > Projects

Clos de la Tech

July 17, 2012

Background Clos de la Tech was founded in 1994 by T.J. Rodgers and Valeta Massey. Clos de la Tech focuses on producing highly limited Pinot Noirs at their three California vineyards. T.J. is from the semiconductor business and places one of his silicon chips on every bottle to represent the ‘Tech’ in Clos de la … Read More

Kryton > Projects

Hillcrest High School

October 26, 2011

Background The Hillcrest High School construction project is part of Alvord Unified School District’s plan to increase the local school capacity and help absorb some of the congestion from other schools in the area. The $97.5 million project will sit on a 200,000 square meters (50 acre) site off the 91 freeway in Southern California’s … Read More

Kryton > Projects
700 West 8th

700 West 8th

September 12, 2011

Supporting Shotcrete Construction with the Krystol Assurance Program Background To create additional convenient living space for families in the Fairview neighborhood of Vancouver, Canada, Westbank Corp. decided that they would transform the area of 700 West 8th. Initially, the place was just a parking lot for a nearby hotel and casino. However, with Westbank Corp.’s … Read More

Kryton > Projects
  1. 1
  2. 2
  3. >

Latest Tweet

We were excited to kick off 2023 with our long-anticipated POWERUP 2023 event in Las Vegas last month.… https://t.co/PH7k0tYRpg
2 days ago

Kryton Concrete Blog Kryton on Facebook Kryton on Twitter Kryton on LinkedIn Kryton on YouTube

Subscribe to our eNewsletter

Stay connected and subscribe to get the latest news. You can unsubscribe at any time.

"*" indicates required fields

By submitting the form, you agree to our Terms and Conditions and Privacy Policy

Terms of Use Privacy Policy Distributor Portal
Toll Free: +1.800.267.8280 Tel: +1.604.324.8280 Email us

Corporate Headquarters: 1645 East Kent Avenue, Vancouver, British Columbia, V5P 2S8 Canada

Calgary (Cementec): 13 Industry Way SE, Calgary, Alberta T3S 0A2 Canada

China: Room 1012, Block B, Tongzhou Wanda Plaza, No. 58, Xinhua West Street, Tongzhou District, Beijing

India (Kryton Buildmat Co. Pvt.): 136-137 Centrum Plaza, Golf Course Road, Sector 53, Gurgaon Haryana 122002

©2023 Kryton International Inc.