Kryton Smart Concrete® INTEGRAL WATERPROOFING & DURABILITY SOLUTIONS
b
  • English
  • Spanish
  • India
  • China
  • Products
    • Krystol® Technology
    • Smart Concrete®
    • Admixtures & Additives
      • Krystol Internal Membrane™ (KIM®)
      • Hard-Cem®
      • Con-Fume®
      • Krystol Mortar Admixture™ (KMA)
    • Surface Applied Waterproofing
      • Krystol Broadcast™
      • Krystol T1® Concrete Waterproofing
      • Hydrostop™ Sealer
    • Construction Joints & Details
      • Krystol Waterstop Grout™
      • Krystol Waterstop Treatment™
      • Krytonite™ Swelling Waterstop
      • Crack Inducing Waterstop
    • Concrete Repairs
      • Krystol Leak Repair System
      • Krystol Repair Grout™
      • Krystol Bari-Cote™
    • Concrete Monitoring
    • Standard Warranty
    • Krystol Assurance Program™ (KAP)
  • Case Studies
  • Resources
    • Information for Owners/Developers
    • Information for Architects
    • Information for Engineers
    • Information for General Contractors
    • Information for Concrete Producers
    • Technical Info
      • Application Overviews
      • Application Instructions
      • Specifications
      • Technical Data Sheets
      • Safety Data Sheets
      • CAD Drawings
      • Testing & Certification
      • LEED
    • Courses
    • Brochures
    • Videos
  • Sustainability
  • About
    • Why Kryton
    • Leadership
    • Our Values
    • Kryton History
    • Testimonials
    • News
    • Blog
    • Careers
      • Life as Krytonite
      • Current Positions
  • Find a Distributor
  • Become a Distributor
  • Regions
    • Spanish – Español
    • India – English
    • China – 简体字

General Foundation

  1. <
  2. 1
  3. 2
  4. 3
  5. 4
  6. 5
  7. 6
  8. 7
  9. 8
  10. ...
  11. 25
  12. >

Anvil Centre

July 13, 2018

Mitigating Flood Damage with LEED Gold Certification Background On September 14, 2014, the Anvil Centre became open to the public in the heart of downtown New Westminster, British Columbia, Canada. Unique in both appearance and structure, the building is a civic center and office tower that makes use of natural limestone and modern glazing to … Read More

Kryton > Projects

The Verve

June 21, 2018

Protecting Underground Parking in a Flood Zone Background With interiors created by award-winning designer Cecconi Simone and the overall design managed by the architectural firm Giannone Petricone Associates, the Verve has been a beautiful addition to its surrounding urban neighborhood in Calgary, Alberta. More specifically, it offers residents in Calgary’s East Village a 25-story tower … Read More

Kryton > Projects

Popkum Bridge Resurfacing

April 10, 2018

Protecting Reinforcing Steel and Mitigating Freeze-Thaw Damage Background To upgrade the bridges on Highway 9 in British Columbia, Canada, the provincial government made a multimillion dollar investment. For the Popkum Train Overpass Bridge in particular, which was built in the 1950s, this investment would bring it up to modern seismic and safety standards. To ensure … Read More

Kryton > Projects

The Odom Corp. Beverage Distribution Facilities

March 22, 2018

Protecting Concrete Wear Life Successfully for Multiple Facilities Background To meet increasing demand for premier beverage distribution in the State of Washington, The Odom Corp. wanted to expand. As a popular wholesale distributor of premier beverages, they already had a Washington facility alongside operations throughout Alaska, Hawaii, Idaho, and Oregon. However, they would need to … Read More

Kryton > Projects

Kent Building Supplies

March 20, 2018

Leveraging a Versatile and Sustainable Concrete Hardening Solution Background Kent Building Supplies is a chain of 48 retail home improvement stores in Atlantic Canada. Founded in 1974, it is the region’s largest big-box building supply outlet store both in terms of locations and sales. As a result, Kent Building Supplies employs over 3,400 people throughout … Read More

Kryton > Projects

Liquor Distribution Center

February 22, 2018

Maintaining Operational Efficiency with the Desired Durability Background Back in 2018, the Alberta Gaming, Liquor and Cannabis Commission (AGLC) opened their $142 million liquor distribution center. This facility came with around 43,664 m2 (470,000 ft2) of space, which included a multi-level main floor and a two-story shipping office. All of which has enabled it to supply … Read More

Kryton > Projects

Cole Harbour Place Ice Rink

February 5, 2018

Adding Superior Abrasion and Erosion Resistance to the Home of Sidney Crosby Background Cole Harbour Place, the home of Sidney Crosby, is a state-of-the-art, multi-use facility located in Dartmouth, Nova Scotia. Built in 1988 with the intention of encouraging a healthy and athletic lifestyle, Cole Harbour Place has since become a focal point of the … Read More

Kryton > Projects

Johnson Street Bridge

January 16, 2018

Strengthening Concrete with CSA- and ASTM-Approved Silica Fume Background The third and current version of Johnson Street Bridge was built at its present location in Victoria, British Columbia, in 1924. A 2009 assessment of the existing bridge identified extensive corrosion to the bridge’s structural beams, obsolete mechanical and electrical systems, and a seismic vulnerability. It … Read More

Kryton > Projects

Lorenzetti Acres Ltd. Dairy Farm

January 12, 2018

Increasing Efficiency and Reducing Operational Costs with Hard-Cem Background Lorenzetti Acres Ltd. is a family-run dairy operation located in Hope, British Columbia, Canada. Established in 1959, the dairy farm has served Canadians for over 60 years. However, their reliable, calcium-laden service ran into a complication in 2015. At that time, a devastating fire erupted, burning … Read More

Kryton > Projects

NYU Langone Medical Center Foundation Repairs

November 17, 2017

Repairing Cracks and Leaks Permanently in a High Flood Risk Area Background After Superstorm Sandy struck New York in 2012, much of the lower infrastructure for the New York University Langone Medical Center (NYULMC) building had flooded. In response, the NYULMC took great measures to protect the infrastructure from future flooding. These included a variety … Read More

Kryton > Projects
  1. <
  2. 1
  3. 2
  4. 3
  5. 4
  6. 5
  7. 6
  8. 7
  9. 8
  10. ...
  11. 25
  12. >

Latest Tweet

We were excited to kick off 2023 with our long-anticipated POWERUP 2023 event in Las Vegas last month.… https://t.co/PH7k0tYRpg
3 days ago

Kryton Concrete Blog Kryton on Facebook Kryton on Twitter Kryton on LinkedIn Kryton on YouTube

Subscribe to our eNewsletter

Stay connected and subscribe to get the latest news. You can unsubscribe at any time.

"*" indicates required fields

By submitting the form, you agree to our Terms and Conditions and Privacy Policy

Terms of Use Privacy Policy Distributor Portal
Toll Free: +1.800.267.8280 Tel: +1.604.324.8280 Email us

Corporate Headquarters: 1645 East Kent Avenue, Vancouver, British Columbia, V5P 2S8 Canada

Calgary (Cementec): 13 Industry Way SE, Calgary, Alberta T3S 0A2 Canada

China: Room 1012, Block B, Tongzhou Wanda Plaza, No. 58, Xinhua West Street, Tongzhou District, Beijing

India (Kryton Buildmat Co. Pvt.): 136-137 Centrum Plaza, Golf Course Road, Sector 53, Gurgaon Haryana 122002

©2023 Kryton International Inc.