Kryton Smart Concrete® INTEGRAL WATERPROOFING & DURABILITY SOLUTIONS
b
  • English
  • Spanish
  • India
  • China
  • Products
    • Krystol® Technology
    • Smart Concrete®
    • Admixtures & Additives
      • Krystol Internal Membrane™ (KIM®)
      • Hard-Cem®
      • Con-Fume®
      • Krystol Mortar Admixture™ (KMA)
    • Surface Applied Waterproofing
      • Krystol Broadcast™
      • Krystol T1® Concrete Waterproofing
      • Hydrostop™ Sealer
    • Construction Joints & Details
      • Krystol Waterstop Grout™
      • Krystol Waterstop Treatment™
      • Krytonite™ Swelling Waterstop
      • Crack Inducing Waterstop
    • Concrete Repairs
      • Krystol Leak Repair System
      • Krystol Repair Grout™
      • Krystol Bari-Cote™
    • Concrete Monitoring
    • Standard Warranty
    • Krystol Assurance Program™ (KAP)
  • Case Studies
  • Resources
    • Information for Owners/Developers
    • Information for Architects
    • Information for Engineers
    • Information for General Contractors
    • Information for Concrete Producers
    • Technical Info
      • Application Overviews
      • Application Instructions
      • Specifications
      • Technical Data Sheets
      • Safety Data Sheets
      • CAD Drawings
      • Testing & Certification
      • LEED
    • Courses
    • Brochures
    • Videos
  • Sustainability
  • About
    • Why Kryton
    • Leadership
    • Our Values
    • Kryton History
    • Testimonials
    • News
    • Blog
    • Careers
      • Life as Krytonite
      • Current Positions
  • Find a Distributor
  • Become a Distributor
  • Regions
    • Spanish – Español
    • India – English
    • China – 简体字

New Construction

  1. <
  2. 1
  3. ...
  4. 7
  5. 8
  6. 9
  7. 10
  8. 11
  9. 12
  10. 13
  11. ...
  12. 22
  13. >

Te Raukura Building

September 21, 2011

Background The Te Wharewaka O Poneke Building (Canoe House) was developed to serve as the entertainment center for the 2011 Rugby World Cup. The development showcases the rich history of Maori art and culture, and includes exhibition and function areas, a café and offices. It will also host powhiri (a Maori ritual ceremony), carvings, cultural … Read More

Kryton > Projects

Chinese Embassy, Netherlands

September 21, 2011

Background The Chinese Embassy at The Hague in the Netherlands is a high security government building that is designed to be durable and long lasting. A major concern on this project was the potential for water leakage through the sub grade cold-joints at the intersection of the concrete slabs. The building is surrounded by a … Read More

Kryton > Projects
700 West 8th

700 West 8th

September 12, 2011

Supporting Shotcrete Construction with the Krystol Assurance Program Background To create additional convenient living space for families in the Fairview neighborhood of Vancouver, Canada, Westbank Corp. decided that they would transform the area of 700 West 8th. Initially, the place was just a parking lot for a nearby hotel and casino. However, with Westbank Corp.’s … Read More

Kryton > Projects

Auckland District Health Board Car Park

September 12, 2011

Background Auckland District Health Board (ADHB) wanted to improve their hospital facilities for visitors and patients. ADHB proposed a new $12 million USD ($15 million NZD) development that included a sixlevel parking building, shops and cafes. ADHB contracted Mainzeal for the design and build of the project. Solution Mainzeal used Kryton’s Krystol Internal Membrane (KIM) … Read More

Kryton > Projects

Marina Coastal Expressway Contract 485

August 27, 2011

Background Singapore’s Marina Bay area is being developed as a major destination for business, arts and entertainment and living. To support the anticipated increase in transit volume generated by the area the Singapore Land Transport Authority has added to a new network of expressways. The new Marina Coastal Expressway (MCE) will connect the eastern and … Read More

Kryton > Projects

Plaza Carso

August 23, 2011

Background Built and owned by the richest man in the world, Carlos Slim, Plaza Carso is a remarkable integrated plaza. The mixed-use project sits on a 50,000 square meter (540,000 square foot) site and incorporates three office towers, three residential towers with 435 apartment units, a mall, five restaurants, a cinema with 14 theatres, and … Read More

Kryton > Projects

Guelph Market Square

July 29, 2011

Background In 2007 the City of Guelph wanted to recreate their historic market grounds dating from the 1800s and create a gathering space for people and families. They had recently revamped their City Hall and envisioned a contemporary version of the city’s historic square. Through $1.1 million in volunteer raised funds, plus federal and provincial … Read More

Kryton > Projects

Vancouver Forest

July 17, 2011

Background Vancouver Forest is a unique 900-unit residential development located about 30 minutes from Beijing’s international airport. The site has been designed to replicate a mini-Vancouver neighborhood complete with west-side Vancouver-style housing, natural landscaping and lots of trees. The Canadian style of housing is very popular in China with Chinese wanting to live in ‘North … Read More

Kryton > Projects

Brewery District

July 17, 2011

Background The Brewery District development sits on the land formally occupied by the Labat Brewing Company. The former buildings on the site had been used for over 125 years of brewery operations. When Labat decommissioned their brewery in 2005 the site was purchased for a mixed use development. The nine-acre site has a beautiful view … Read More

Kryton > Projects

Crystal Pavilions at Marina Bay Sands

May 22, 2011

Background Marina Bay Sands’ Crystal Pavilions are located just opposite the Marina Bay Sands promenade. These uniquely designed pavilions appear to float on the water. When the Marina Bay Sands builders were looking to construct the two stand-alone floating Crystal Pavilions they didn’t need to look far for a solution. The team chose Kryton’s Krystol … Read More

Kryton > Projects
  1. <
  2. 1
  3. ...
  4. 7
  5. 8
  6. 9
  7. 10
  8. 11
  9. 12
  10. 13
  11. ...
  12. 22
  13. >

Latest Tweet

We were excited to kick off 2023 with our long-anticipated POWERUP 2023 event in Las Vegas last month.… https://t.co/PH7k0tYRpg
3 days ago

Kryton Concrete Blog Kryton on Facebook Kryton on Twitter Kryton on LinkedIn Kryton on YouTube

Subscribe to our eNewsletter

Stay connected and subscribe to get the latest news. You can unsubscribe at any time.

"*" indicates required fields

By submitting the form, you agree to our Terms and Conditions and Privacy Policy

Terms of Use Privacy Policy Distributor Portal
Toll Free: +1.800.267.8280 Tel: +1.604.324.8280 Email us

Corporate Headquarters: 1645 East Kent Avenue, Vancouver, British Columbia, V5P 2S8 Canada

Calgary (Cementec): 13 Industry Way SE, Calgary, Alberta T3S 0A2 Canada

China: Room 1012, Block B, Tongzhou Wanda Plaza, No. 58, Xinhua West Street, Tongzhou District, Beijing

India (Kryton Buildmat Co. Pvt.): 136-137 Centrum Plaza, Golf Course Road, Sector 53, Gurgaon Haryana 122002

©2023 Kryton International Inc.