Kryton Smart Concrete® INTEGRAL WATERPROOFING & DURABILITY SOLUTIONS
b
  • English
  • Spanish
  • India
  • China
  • Products
    • Krystol Internal Membrane™ (KIM®)
    • Hard-Cem®
    • Admixtures & Additives
      • Krystol Internal Membrane™ (KIM®)
      • Hard-Cem®
      • Con-Fume®
      • Krystol Mortar Admixture™ (KMA)
    • Surface Applied Waterproofing
      • Krystol Broadcast™
      • Krystol T1® Concrete Waterproofing
      • Hydrostop™ Sealer
    • Construction Joints & Details
      • Krystol Waterstop Grout™
      • Krystol Waterstop Treatment™
      • Krytonite™ Swelling Waterstop
      • Crack Inducing Waterstop
    • Concrete Repairs
      • Krystol Leak Repair System
      • Krystol Repair Grout™
      • Krystol Bari-Cote™
    • Concrete Monitoring
    • Standard Warranty
    • Krystol Assurance Program™ (KAP)
    • Krystol® Technology
    • Smart Concrete®
  • Sectors
    • Buildings
    • Industrial
    • Infrastructure
  • Case Studies
  • Resources
    • Information for Owners/Developers
    • Information for Architects
    • Information for Engineers
    • Information for General Contractors
    • Information for Concrete Producers
    • Technical Info
      • Application Overviews
      • Application Instructions
      • Specifications
      • Technical Data Sheets
      • Safety Data Sheets
      • CAD Drawings
      • Testing & Certification
    • Courses
    • Brochures
    • Videos
  • Sustainability
    • LEED
  • About
    • Why Kryton
    • Leadership
    • Our Values
    • Kryton History
    • Testimonials
    • News
    • Blog
    • Careers
      • Life as Krytonite
      • Current Positions
  • Contact Us
  • Find a Distributor
  • Regions
    • Spanish – Español
    • India – English
    • China – 简体字

Projects: Case Studies

Case Study Library

Search using the fields below to find a project.

Reset Search Filter
Location: Burnaby, BC, Canada
Owner: City of Burnaby
Architect/Engineer: Omicron
Contractor: Turner Construction Co.
Ready-Mix Supplier: BURNCO Rock Products Ltd.
Download Case Study

Laurel Street Works Yard Redevelopment

Burnaby, BC, Canada

  • Home
  • Projects
  • Laurel Street Works Yard Redevelopment

Raising the Sustainability and Lowering the Cost of the Laurel Street Works Yard

Background

After over six decades of service for the City of Burnaby since 1954, the Laurel Street Works Yard needed an upgrade. While reliable, its facility could no longer keep up with the city’s growing maintenance and equipment needs. With that in mind, the city funded a $76-million redevelopment project for the works yard, which was divided into two phases. The first phase involved the construction of a yard building. The process for that went smoothly, so it was time for the second phase, which would involve the construction of the main building. That meant developing a space for engineering operations with an expanded fleet repair garage, a crew muster station, a facilities management shop, central stores, a new fueling station, and data and emergency operations centers.

It would all be expected to last for a long time to help the operations for the City of Burnaby run smoothly. To make that a reality, the construction team needed to ensure that the main building’s concrete could withstand the abrasive force of equipment maintenance and remain free from water ingress to maintain optimal structural integrity.

Solution

For reliable concrete abrasion resistance and waterproofing protection, the construction team turned to Kryton’s award-winning Hard-Cem and KIM admixtures due to their decades of field-proven success. With Hard-Cem, they gave the maintenance facilities’ concrete a more resilient cement paste. That made the concrete highly resistant to abrasive and erosive forces, which would more than double the works yard’s life span. Meanwhile, the team’s use of KIM ensured that the substructure of the works yard would remain permanently dry and free from leakages, protecting its structural integrity.

It was an application process that didn’t require complex, time-consuming steps and significantly reduced the chances that the works yard would need concrete repair or replacement sessions in the future. As a result, the Laurel Street Works Yard would have a longer life span and require less additional costly carbon-intensive cement throughout its years in operation. That in turn would decrease its overall lifetime carbon footprint, making the project more sustainable and resilient while keeping construction and operational costs low.


Products and Systems Used:

Krystol Internal Membrane™ (KIM®)

Krystol Internal Membrane (KIM) is a hydrophilic crystalline admixture used to create permanently waterproof concrete.

View Details

Hard-Cem®

Hard-Cem is a revolutionary concrete admixture that can significantly enhance the durability and sustainability of concrete. Incorporating Hard-Cem into your concrete mix can yield various advantages, such as reducing a project’s lifetime carbon footprint, minimizing upkeep and repairs that can be costly and contribute to carbon emissions, reducing worksite downtime, and eliminating the need for...

View Details

Subscribe to our eNewsletter

Stay connected and subscribe to get the latest news. You can unsubscribe at any time.

"*" indicates required fields

By submitting the form, you agree to our Terms and Conditions and Privacy Policy

Terms of Use Privacy Policy Distributor Portal
Toll-Free: +1.800.267.8280 Tel: +1.604.324.8280 Contact Us

Corporate Headquarters: 1645 East Kent Avenue, Vancouver, British Columbia, V5P 2S8 Canada

Calgary (Cementec): 13 Industry Way SE, Calgary, Alberta T3S 0A2 Canada

China: Room 1012, Block B, Tongzhou Wanda Plaza, No. 58, Xinhua West Street, Tongzhou District, Beijing

India (Kryton Buildmat Co. Pvt.): 136-137 Centrum Plaza, Golf Course Road, Sector 53, Gurgaon Haryana 122002

©2023 Kryton International Inc.