Kryton Smart Concrete® INTEGRAL WATERPROOFING & DURABILITY SOLUTIONS
b
  • English
  • Spanish
  • India
  • China
  • Products
    • Krystol® Technology
    • Smart Concrete®
    • Admixtures & Additives
      • Krystol Internal Membrane™ (KIM®)
      • Hard-Cem®
      • Con-Fume®
      • Krystol Mortar Admixture™ (KMA)
    • Surface Applied Waterproofing
      • Krystol Broadcast™
      • Krystol T1® Concrete Waterproofing
      • Hydrostop™ Sealer
    • Construction Joints & Details
      • Krystol Waterstop Grout™
      • Krystol Waterstop Treatment™
      • Krytonite™ Swelling Waterstop
      • Crack Inducing Waterstop
    • Concrete Repairs
      • Krystol Leak Repair System
      • Krystol Repair Grout™
      • Krystol Bari-Cote™
    • Concrete Monitoring
    • Standard Warranty
    • Krystol Assurance Program™ (KAP)
  • Case Studies
  • Resources
    • Information for Owners/Developers
    • Information for Architects
    • Information for Engineers
    • Information for General Contractors
    • Information for Concrete Producers
    • Technical Info
      • Application Overviews
      • Application Instructions
      • Specifications
      • Technical Data Sheets
      • Safety Data Sheets
      • CAD Drawings
      • Testing & Certification
      • LEED
    • Courses
    • Brochures
    • Videos
  • Sustainability
  • About
    • Why Kryton
    • Leadership
    • Our Values
    • Kryton History
    • Testimonials
    • News
    • Blog
    • Careers
      • Life as Krytonite
      • Current Positions
  • Find a Distributor
  • Become a Distributor
  • Regions
    • Spanish – Español
    • India – English
    • China – 简体字

Projects: Case Studies

Case Study Library

Search using the fields below to find a project.

Reset Search Filter
Location: Guizhou, China
Owner: China State Railway Group Co., Ltd.
Distributors: Beijing Huatie Hengrui Technology Co., Ltd. and Tianjin Hongba Waterproofing Materials Co., Ltd.
Download Case Study

High-Speed Rail Tunnel Repair

Guizhou, China

  • Home
  • Projects
  • Tunnels
  • High-Speed Rail Tunnel Repair

Ensuring a Safe, Dry, and Watertight HSR System in China

Background

High-speed rail (HSR) traffic moves significantly faster than traditional rail traffic. As of 2018, China has the longest HSR network in the world with over 29,000 km (18,019.77 mi) of HSR laid. Their HSR transports billions of passengers and billions of tonnes in freight every year.

Creating this amazing way to travel is not without its challenges, however. For instance, engineers often have issues with waterproofing, especially when it comes to constructing the middle of an HSR’s tunnel. These issues not only influence the project’s consistency and durability, but they also directly affect the normal usage and safety of the whole railway.

When an HSR tunnel in Guizhou, a province in Southwest China, developed a consistent and massive leak, the China State Railway Group Co., Ltd. needed a long-term, durable solution with a short application time to ensure as little disruption as possible to railway operations.

The leak was massive. Its water flow was over 30 L per minute due to the immense pressure created from the 100 m (328.08 ft) of earth above the tunnel.

Exacerbating the problem was the fact that the tunnel’s concrete surfaces were designed with extremely high standards of firmness and bonding strength to ensure the trains could move safely through the tunnel in excess of 250 km (155.34 mi) per hour. Any loose, flaking, or falling material could cause catastrophic damage to the trains. And any repairs would require the same exacting standards to ensure the HSR remained safe. Moreover, all the operating platforms and repair work were expected to be finished within three hours between 12 am and 3 am.

Solution

Working with Beijing Huatie Hengrui Technology Co., Ltd., Tianjin Hongba Waterproofing Materials Co., Ltd. provided the solution the China State Railway Group Co., Ltd. was looking for: Kryton’s safe and efficient repair system.

The first step in this system was to clean up the leaking crack and remove loose concrete and other detritus. Next, grinders were employed to create a groove or chase at the leaking point, shaped for the application of Kryton’s Krystol Plug. The plug was then applied, completely stopping the water flow. Krystol Repair Grout was then used to fill the chase flush to the surface of the tunnel wall. After the repair was completed, Krystol T1 was applied to prevent further concrete deterioration and leaks.

Kryton’s repair products have assured the China State Railway Group Co., Ltd. that their HSR trains could once again move quickly and safely through a completely dry tunnel.


Products and Systems Used:

Krystol T1® Concrete Waterproofing

Krystol Leak Repair System

Krystol T1 is a surface applied crystalline slurry treatment that transforms new or existing concrete into a permanent waterproofing barrier.

View Details

Krystol Plug™

Krystol Leak Repair System

As part of the Krystol Leak Repair System, Krystol Plug is a rapid-setting hydraulic cement product that when mixed with water is used to stop flowing water and repair leaking cracks, holes and joints in concrete.

View Details

Krystol Repair Grout™

Krystol Leak Repair System

As part of the Krystol Leak Repair System, Krystol Repair Grout is a crystalline concrete waterproofing product that stops the flow of water to permanently repair leaking cracks, holes and joints in concrete, and can also be used to resurface and waterproof defective, damaged or deteriorating concrete. The grout employs advanced fiber technology and shrinkage controlling additives to prevent cracking.

View Details

Subscribe to our eNewsletter

Stay connected and subscribe to get the latest news. You can unsubscribe at any time.

"*" indicates required fields

By submitting the form, you agree to our Terms and Conditions and Privacy Policy

Terms of Use Privacy Policy Distributor Portal
Toll Free: +1.800.267.8280 Tel: +1.604.324.8280 Email us

Corporate Headquarters: 1645 East Kent Avenue, Vancouver, British Columbia, V5P 2S8 Canada

Calgary (Cementec): 13 Industry Way SE, Calgary, Alberta T3S 0A2 Canada

China: Room 1012, Block B, Tongzhou Wanda Plaza, No. 58, Xinhua West Street, Tongzhou District, Beijing

India (Kryton Buildmat Co. Pvt.): 136-137 Centrum Plaza, Golf Course Road, Sector 53, Gurgaon Haryana 122002

©2023 Kryton International Inc.