Discover how Hard-Cem can reduce lifecycle costs, lower maintenance requirements, and significantly extend the service life of your concrete - Try the Hard-Cem ROI Calculator Now
Search using the fields below to find a project.
Vancouver, BC, Canada
Westin Wall is a hotel and residential tower built around 2010 without Krystol Internal Membrane (KIM) in the original concrete. The development subsequently experienced significant cracking in the raft slab and ongoing water leakage. Several rounds of repairs using grout and injection have been undertaken, but leakage reportedly continues. The interior parkade ramp is also reported to have inadequate detailing and to be subject to high hydrostatic pressure. Krystol Leak Repair System is the identified solution for addressing the reported leakage at Westin Wall.
Brooklyn, New York, USA
Miami, Florida, USA
Temuco, Chile
Lusail, Qatar
Sofia, Bulgaria
Hong Kong, China