Watch Our Webinar: Concrete Repair and Waterproofing: Preventing Damage and Reducing Maintenance Costs - Watch Now
Background The Port of Entry Facility at the Point Roberts Border Crossing was designed with good soil drainage, visquene (poly-ethylene plastic), and an 8-inch (200 mm) concrete slab on both the 1st and 2nd floor. However, hydrostatic pressure under the slabs forced excessive amounts of moisture to push through the concrete and affect the adhesion … Read More
Background Richmond Aquatic Center was constructed in 1996 near the Fraser River in Richmond, BC. The facility’s 57 meter (187 feet) competitive pool has an 5.5 meter (18 foot) dive tank that is 3 meters (10 feet). below the water table. Because of the proximity to the ocean and major river system, the high water … Read More
Background The Zhangjiang Hi-Tech Park located in Shanghai is a large technology park with over 110 research and development institutions and over 300 companies including large multi-nationals such as Citibank and SAP. At this particular building in the technology park, the originally installed waterproofing membrane had failed and leaks inside the walls were a problem. … Read More