Kryton Smart Concrete® INTEGRAL WATERPROOFING & DURABILITY SOLUTIONS
b
  • English
  • Spanish
  • India
  • China
  • Products
    • Krystol® Technology
    • Smart Concrete®
    • Admixtures & Additives
      • Krystol Internal Membrane™ (KIM®)
      • Hard-Cem®
      • Con-Fume®
      • Krystol Mortar Admixture™ (KMA)
    • Surface Applied Waterproofing
      • Krystol Broadcast™
      • Krystol T1® Concrete Waterproofing
      • Hydrostop™ Sealer
    • Construction Joints & Details
      • Krystol Waterstop Grout™
      • Krystol Waterstop Treatment™
      • Krytonite™ Swelling Waterstop
      • Crack Inducing Waterstop
    • Concrete Repairs
      • Krystol Leak Repair System
      • Krystol Repair Grout™
      • Krystol Bari-Cote™
    • Concrete Monitoring
    • Standard Warranty
    • Krystol Assurance Program™ (KAP)
  • Case Studies
  • Resources
    • Information for Owners/Developers
    • Information for Architects
    • Information for Engineers
    • Information for General Contractors
    • Information for Concrete Producers
    • Technical Info
      • Application Overviews
      • Application Instructions
      • Specifications
      • Technical Data Sheets
      • Safety Data Sheets
      • CAD Drawings
      • Testing & Certification
      • LEED
    • Courses
    • Brochures
    • Videos
  • Blog
  • About
    • Why Kryton
    • Leadership
    • Our Values
    • Kryton History
    • Testimonials
    • News
    • eNewsletter
    • Careers
      • Life as Krytonite
      • Current Positions
  • Find a Distributor
  • Become a Distributor
  • Regions
    • Spanish – Español
    • India – English
    • China – 简体字

Architect

  1. 1
  2. 2
  3. 3
  4. >
Oakridge Centre redevelopment worksite

Oakridge Centre Redevelopment

November 2, 2022

Creating a Watertight Town Center with Cost-Effective, Sustainable Solutions Background With an ambitious vision to give Vancouver residents in Oakridge a newer, better standard of living, QuadReal Property Group Ltd. has partnered with Westbank Corp. to redevelop the 28-acre Oakridge Centre site. Under their direction, the site has undergone a $5-billion overhaul, which will cover … Read More

Kryton > Projects
SAY Health and Community Centre worksite

SAY Health and Community Centre

September 9, 2022

Giving a First Nation Gymnasium Eco-Friendly Durability Background As part of a collaborative effort to expand their health, community, culture, and recreation services, the Skowkale, Aitchelitz, and Yakweakwioose First Nations chose to develop a health and community center. Funded by the First Nations themselves for over $1 million and also through government investments of more … Read More

Kryton > Projects
An excavator rests near a partially completed worksite for The Paramount development.

The Paramount

August 3, 2022

Protecting a LEED-Friendly Development from a High Water Table Background Despite the risk of water ingress that Richmond’s high water table poses for buildings in the area, the city still holds many prime real estate locations for both businesses and families. As an experienced developer, Keltic Development Ltd. was able to spot one in particular … Read More

Kryton > Projects
Construction workers are working on setting up a worksite and shotcrete for the construction of Woolworths' Moorebank distribution centers.

Woolworths Group Ltd.’s Moorebank Distribution Centers

June 9, 2022

Producing Concrete That Exceeds the AR0.5 Abrasion Class Background As Australia’s largest and most preferred supermarket, Woolworths soon found that their customer demand had outgrown their current product capacity. Even with over 1,000 store locations across Australia, the supermarket franchise was struggling to keep up. It led the franchise owner, Woolworths Group Ltd., to look … Read More

Kryton > Projects

Pier West

February 8, 2022

Optimizing a Concrete Mix’s Permeability to Protect a Hossein Amanat Creation Background Designed to revitalize New Westminster’s waterfront scene, Bosa Development’s Pier West project brings with it multiple transformational developments. Shaped by Hossein Amanat, a world-renowned architect, these developments will include two residential towers, a two-acre addition to the surrounding Pier Park, a building with … Read More

Kryton > Projects

DHAMAN Hospitals

January 14, 2022

Repairing Membrane Failures with Permanent Smart Concrete Solutions Background As part of their efforts to establish themselves as a prime provider for quality health-care services in Kuwait, DHAMAN has been working on constructing two hospitals. One will be set in Al Ahmadi, serving the communities there, while the other will be set in Al Jahra … Read More

Kryton > Projects

30 Hudson Yards and Retail Podium

June 26, 2019

Creating an Award-Winning Smart Building Environment  Background 30 Hudson Yards is the tallest of the towers in the Hudson Yards megaproject, which is currently being constructed in New York City’s west side. As part of the largest private real estate development in the history of the United States of America, this tall tower covers 241,500 … Read More

Kryton > Projects

10 Jay Street Restoration

November 6, 2016

Leveraging the Technical Support of a Kryton-Exclusive Distributor Background The 10 Jay Street building was originally built in 1898 and housed the Arbuckle Brothers sugar refinery until 1945. Subsequently, the building was used as a warehouse until recently when redevelopment plans were initiated. As part of those plans, the prestigious architecture firm ODA came up … Read More

Kryton > Projects

Mark on 10th

September 16, 2016

Helping Build Multiple Watertight Towers across Calgary Background The mid- to late 2010s were an especially great time to find a newly constructed watertight building to live or work in around Calgary in Alberta, Canada. With the hard work and waterproofing expertise of Kryton’s distributor in Alberta, Cascade Aqua-Tech Ltd., Calgary neighborhoods saw the completed … Read More

Kryton > Projects

Central Plaza Repairs

June 9, 2016

Protecting the Focal Point of Hong Kong from Water Ingress Background Developed by the Sino Group and Sun Hung Kai Properties Ltd. in Hong Kong, Central Plaza towers 78 stories into the sky. While surrounded by many other magnificent structures, its height and bold architectural concepts have made it a significant focal point in the … Read More

Kryton > Projects
  1. 1
  2. 2
  3. 3
  4. >

Latest Tweet

Simplifying a Challenging Industrial Repair: When Cameron LNG found that the concrete tanks for their new liquefied… https://t.co/OVQkN5uLS2
15 hours ago

Kryton Concrete Blog Kryton on Facebook Kryton on Twitter Kryton on LinkedIn Kryton on YouTube

Subscribe to our eNewsletter

Stay connected and subscribe to get the latest news. You can unsubscribe at any time.

"*" indicates required fields

By submitting the form, you agree to our Terms and Conditions and Privacy Policy

Terms of Use Privacy Policy Distributor Portal
Toll Free: +1.800.267.8280 Tel: +1.604.324.8280 Email us

Corporate Headquarters: 1645 East Kent Avenue, Vancouver, British Columbia, V5P 2S8 Canada

Calgary (Cementec): 13 Industry Way SE, Calgary, Alberta T3S 0A2 Canada

China: Room 1012, Block B, Tongzhou Wanda Plaza, No. 58, Xinhua West Street, Tongzhou District, Beijing

India (Kryton Buildmat Co. Pvt.): 136-137 Centrum Plaza, Golf Course Road, Sector 53, Gurgaon Haryana 122002

©2023 Kryton International Inc.