At Amrize’s Spyhill Ready-Mix Plant in Calgary, concrete floors are exposed to demanding daily operating conditions. Trucks regularly enter and move around the batching equipment, where loose aggregate, grit and other particles can become trapped beneath tires and contribute to significant abrasion. 

The Challenge

Amrize wanted durable concrete floors that could withstand this high-abrasion environment. Traditional dry-shake and surface-applied hardeners would require additional application time and labour, while also introducing the challenge of achieving a consistent installation.

The team wanted to simplify construction while providing wear protection throughout the concrete slab rather than only at the surface. 

The Solution

Amrize selected Hard-Cem Integral Hardening Admixture based on its previous experience with the product on other projects. Hard-Cem was incorporated directly into the concrete, providing abrasion resistance throughout the slab and eliminating the need for a separate surface-hardener application. 

Approximately 528 bags of Hard-Cem were supplied for the project at a dosage of three bags per cubic metre. Hard-Cem was used in the truck loading and access areas and adjoining floor bays, where abrasion from truck traffic and loose aggregate is a key concern.

The objective is a durable floor capable of handling daily operational wear while helping reduce future repair and maintenance interruptions. Amrize also plans to use Hard-Cem in the plant’s exterior driveway slab.