Kryton Smart Concrete® INTEGRAL WATERPROOFING & DURABILITY SOLUTIONS
b
  • English
  • Spanish
  • India
  • China
  • Products
    • Krystol® Technology
    • Smart Concrete®
    • Admixtures & Additives
      • Krystol Internal Membrane™ (KIM®)
      • Hard-Cem®
      • Con-Fume®
      • Krystol Mortar Admixture™ (KMA)
    • Surface Applied Waterproofing
      • Krystol Broadcast™
      • Krystol T1® Concrete Waterproofing
      • Hydrostop™ Sealer
    • Construction Joints & Details
      • Krystol Waterstop Grout™
      • Krystol Waterstop Treatment™
      • Krytonite™ Swelling Waterstop
      • Crack Inducing Waterstop
    • Concrete Repairs
      • Krystol Leak Repair System
      • Krystol Repair Grout™
      • Krystol Bari-Cote™
    • Concrete Monitoring
    • Standard Warranty
    • Krystol Assurance Program™ (KAP)
  • Case Studies
  • Resources
    • Information for Owners/Developers
    • Information for Architects
    • Information for Engineers
    • Information for General Contractors
    • Information for Concrete Producers
    • Technical Info
      • Application Overviews
      • Application Instructions
      • Specifications
      • Technical Data Sheets
      • Safety Data Sheets
      • CAD Drawings
      • Testing & Certification
      • LEED
    • Courses
    • Brochures
    • Videos
  • Sustainability
  • About
    • Why Kryton
    • Leadership
    • Our Values
    • Kryton History
    • Testimonials
    • News
    • Blog
    • Careers
      • Life as Krytonite
      • Current Positions
  • Find a Distributor
  • Become a Distributor
  • Regions
    • Spanish – Español
    • India – English
    • China – 简体字

Owner/Developer

  1. <
  2. 1
  3. 2
  4. 3
  5. >

Seafood Processing Facility

May 17, 2020

Making Industrial Operations More Sustainable with KIM and Hard-Cem Background While they’re not the first item that people think of when they consider what makes a successful facility, the facility floors are crucial to creating a productive workplace. When smooth and even, these floors allow employees at a facility to work at an optimal pace, … Read More

Kryton > Projects

30 Hudson Yards and Retail Podium

June 26, 2019

Creating an Award-Winning Smart Building Environment  Background 30 Hudson Yards is the tallest of the towers in the Hudson Yards megaproject, which is currently being constructed in New York City’s west side. As part of the largest private real estate development in the history of the United States of America, this tall tower covers 241,500 … Read More

Kryton > Projects
A worker is repairing a chase for one of the PCT tunnels.

Pacific Coast Terminals’ Tunnel Repairs

April 25, 2017

Employing a Comprehensive Leak Repair System without Impacting a Sack Finish Background As part of the Port of Vancouver in British Columbia (BC), Canada, Pacific Coast Terminals Co. Ltd. (PCT) helps contribute to the trade of around $240 billion in goods, which sustains over 115,000 jobs and $11.9 billion in gross domestic product. It’s a … Read More

Kryton > Projects

W South Beach Hotel

September 12, 2016

Repairing Leaks Permanently without Service Disruption Background Beach properties are highly valued for their access to scenic views and close proximity to the beach and leisure opportunities. As a result, the hotels in Miami Beach, Florida, are able to charge a premium price, earning better profits and using them to offer an even better experience … Read More

Kryton > Projects
Concrete is being poured for the showroom building of Mohamed Yousuf Kafood & Sons Trading & Contracting Co.

2B+G+M+2 Showroom Building

December 19, 2015

Eliminating the Need for Time-Consuming Bituminous Membrane Applications Background Since 1978, Mohamed Yousuf Kafood & Sons Trading & Contracting Co. has sold quality plumbing materials, sanitary wares, and bathroom tiles to anyone in need around Doha, Qatar. Over time, demand for their products grew, allowing the business to expand. It wasn’t long after that when … Read More

Kryton > Projects
The Ora building looks almost like a regular set of apartments but with a curved, multi-colored cylindrical-shaped feature in the center.

The Ora

October 21, 2013

Providing a Watertight Structure That Can Endure a High Water Table Environment Background Planning to transform the area around Elmbridge Way and Hollybridge Way into the largest urban community in Richmond, the Onni Group started off with an ambitious design for a structure known as the Ora. This design called for three splendid towers that … Read More

Kryton > Projects
Canada Post trucks are parked under a bright blue sky.

Canada Post Pacific Processing Centre

October 13, 2013

Upgrading the Resiliency of Canada Post’s Service Background After years of diligently serving downtown Vancouver, Canada Post knew they needed to upgrade their work in the area by the early 2010s. While their Vancouver Parcel Delivery Centre and Vancouver Mail Processing Plant had kept up with the times for a while, they were not large … Read More

Kryton > Projects
A male lion for La Aurora Zoo is lying down and looking to the left.

La Aurora Zoo Repairs

June 6, 2013

Repairing Leaks Permanently for One of the Largest Guatemala City Gardens Background Spread out over 35 acres, La Aurora Zoo is known as one of the largest gardens in Guatemala City, and for good reason too. After all, it’s not just the amount of land it has that makes it large. It’s also the number … Read More

Kryton > Projects
Material from the Gibraltar Mine is getting loaded onto machinery.

Gibraltar Mine

April 7, 2012

Developing Cost-Effective Flooring for Gibraltar Mine Background Taseko Mines Ltd.’s Gibraltar copper-molybdenum mine is located in south-central British Columbia, approximately 60 km (37 mi) north of the City of Williams Lake. Built in 1972, the Gibraltar Mine is the second largest open-pit copper-molybdenum mine in Canada. As part of the mine’s multi-phase expansion and modernization … Read More

Kryton > Projects
60 West Cordova Street's worksite is being set up by construction workers.

60 West Cordova Street

April 1, 2012

Creating Affordable Award-Winning Housing Background With the expense of living in Vancouver, Canada, known to be costly, Westbank Corp. wanted to create more affordable housing. As a result, they chose to collaborate on a project with Vancity, Portland Hotel Society, and Habitat for Humanity. Known as 60 West Cordova Street, the project was a building … Read More

Kryton > Projects
  1. <
  2. 1
  3. 2
  4. 3
  5. >

Latest Tweet

Join Kryton at the @ConcreteACI spring convention from April 2-6, 2023 in San Francisco Kryton’s CEO and Chair of… https://t.co/zEciNcIvBT
3 days ago

Kryton Concrete Blog Kryton on Facebook Kryton on Twitter Kryton on LinkedIn Kryton on YouTube

Subscribe to our eNewsletter

Stay connected and subscribe to get the latest news. You can unsubscribe at any time.

"*" indicates required fields

By submitting the form, you agree to our Terms and Conditions and Privacy Policy

Terms of Use Privacy Policy Distributor Portal
Toll Free: +1.800.267.8280 Tel: +1.604.324.8280 Email us

Corporate Headquarters: 1645 East Kent Avenue, Vancouver, British Columbia, V5P 2S8 Canada

Calgary (Cementec): 13 Industry Way SE, Calgary, Alberta T3S 0A2 Canada

China: Room 1012, Block B, Tongzhou Wanda Plaza, No. 58, Xinhua West Street, Tongzhou District, Beijing

India (Kryton Buildmat Co. Pvt.): 136-137 Centrum Plaza, Golf Course Road, Sector 53, Gurgaon Haryana 122002

©2023 Kryton International Inc.