Hard-Cem ROI Calculator

Hard-Cem ROI Calculator

Hard-Cem ROI Calculator

Any major city in North America (example: Dallas, TX or Vancouver, BC). Determines output currency and freight cost.
Enter the total square footage of the slab.
Enter the slab thickness in inches.
Design lifespan of the facility.
Set the dosage relative to default 2 bags/yd³.
Current Dosage: 50%
Industry choice sets downtime cost per hour and resurfacing interval for calculations.
  • Manufacturing: Downtime ~$260,000/hr, resurfacing every 5–7 years (Forbes, Sumitomo Drive, Gitnux; $250k–$300k/hr)
  • Automotive: Downtime ~$2.3–3M/hr, resurfacing every 4–5 years (Siemens, IndustryWeek, Forbes; $1.3M–$3M/hr)
  • Data Center: Downtime ~$600,000/hr, resurfacing every 8 years (Uptime Institute, Pingdom, Ponemon; $500k–$700k/hr)
  • Hydroelectric: Downtime ~$20,000/hr, resurfacing every 5–10 years (U.S. DOE, Industry Case Studies; $10k–$40k/hr)
  • Custom: Enter your own downtime value
Industry selection directly impacts downtime loss, ROI, and savings results.
Resurfacing cycles per Industry Guidelines, National Ready Mixed Concrete Association.
Typical downtime required during resurfacing.
Select your margin level or set a custom value.
Hard-Cem Material Cost (with markup):
Freight Cost Estimate:
Total Hard-Cem Investment (material + freight):
Cost per area (all-in):
Downtime Loss (per event):
Estimated ROI:
Total Resurfacing Cost:
Total Downtime Cost:
Lifetime Savings:
Annual Savings:

Ready to Explore Smart Concrete?

HTML Snippets Powered By : XYZScripts.com