Reduce costs and extend your concrete’s lifespan with Hard-Cem. Learn more

13 Oct 2026

  • Location Burnaby, BC, Canada
  • Industry Commercial
  • Status In Construction
  • Project Type Recreation / Aquatic Facility

Project Description

The new Burnaby Lake Recreation Centre is being built as a major aquatic and recreation facility featuring multiple pools and recreation amenities.

KIM® was dosed directly into the pool slabs and walls, while the Krystol® Waterstop System was used at construction joints and penetrations. Pools place concrete under demanding conditions, including constant hydrostatic pressure, chemically treated water and potential groundwater exposure. Together, the systems provide integral waterproofing through the concrete while addressing the joints and penetrations where leakage is most likely to occur.

Products and Systems Used

Ready to Explore Smart Concrete?

HTML Snippets Powered By : XYZScripts.com