Hard-Cem ROI Calculator – Kryton

Toggle between CAD and USD for cost outputs. Static exchange rate is used (update manually).
Enter the total square footage of the slab.
Impacts volume of concrete and resurfacing interval assumptions.
Design lifespan of the facility.
Set the dosage relative to default 2 bags/yd³.
Current Dosage: 100%
Defines assumed downtime costs and default resurfacing intervals.
Typical downtime required during resurfacing.
Select your margin level.
City for freight cost estimate from Calgary.
Total Hard-Cem Investment:
Cost per sq.ft:
Freight Cost Estimate:
Downtime Loss (per event):
Estimated ROI:
Total Resurfacing Cost:
Total Downtime Cost:
Lifetime Savings:
Annual Savings:

Ready to Explore Smart Concrete?

HTML Snippets Powered By : XYZScripts.com