Water Containment
VVK Pump Chamber
Vinkovci, Croatia
BACKGROUND
The Water Works valve chamber situated 4 meters below grade had constant standing water. In fact, the chamber was always filled to the top at ground level. Many attempts to waterproof the concrete chamber were attempted with no success. Waterworks, Croatia was skeptical regarding suppliers claims of waterproofing abilities.
SOLUTION
In April 1998, the Krystol Crack Repair Specification No. 1 was installed. The entire chamber was subsequently treated with Krystol T1. The chamber has not leaked since. Water Works, Croatia, considers the product application a "Miracle".
| Product |
KIM within shotcrete mix,
Krystol T1/T2, Krystol Plug, Krystol Bari-cote |
| Location |
Vinkovci, Croatia |
| Owner |
Water and Sewage Vinkovci |
| Engineer |
Davorin Kuzmanovic |
| Contractor |
Palir, Zagreb |
| Distributor |
Velin |
Back to Top
|
 |


Krystol™ repair method stops leaks.

Old concrete dryed up after years of water saturation.
|
 |