Water Containment
Reservoir Project List
SKIEL MOUNTAIN WATER RESERVOIR
Location:
Skiel Mtn., Seton Lake, BC, Canada
Date:
March, 2001
Product:
KIM - Krystol Internal Membrane
Contractor:
David Nairne & Associates Ltd.
Engineer:
NewHaven Construction
Ready-mix:
Tri-B Concrete
Solution:
Located in a remote area of BC, a mobile batch plant was required. Despite adverse construction conditions the structure is watertight without the use of membranes or surface applied sealants.
TACHET WATER TREATMENT PLANT
Location:
Lake Babine, BC, Canada
>Date:
1999
Product:
KIM - Krystol Internal Membrane
Engineer:
David Nairne & Associates
Contractor:
General: QQR Mechanical
Ready-mix:
Concrete: Stokes Construction
Solution:
"We have built a lot of water retaining structures and found that there is always some leaks and damp spots after the tanks are filled and it was nice to see the leaks and damp spots cure themselves after a short period of time," Chris Stokes, Stokes Construction.
HARTLEY BAY WATER RESERVOIR
Location:
Prince Rupert, BC, Canada
Date:
1999
Product:
KIM - Krystol Internal Membrane
Engineer:
Kerr, Wood, Leidel & Associates
Contractor:
General: Edvan Construction
Ready-mix:
Concrete: Knutsen Holdings
Solution:
The water treatment facility built for the Hartley Bay Band Council is performing as specified and will provide a permanently watertight reservoir.
SKOOKUMCHUK WATER RESERVOIR
Location:
Bellingham, WA, USA
Date:
April, 2001
Product:
KIM - Krystol Internal Membrane
Contractor:
Mount Baker Silo
Ready-mix:
Ferndale Ready-mix
Solution:
Reservoir was built in seven lifts with steel ring forms. The tank was filled almost immediately and has been in service since June 2001.
CONNECTICUT WATER RESERVOIR
Location:
Norwalk, Connecticut, USA
Date:
March 1999
Product:
KIM - Krystol Internal Membrane
Contractor:
Tri Star Building Corporation
Ready-mix:
O & G Industries
Solution:
The performance of the KIM concrete has been easy to monitor as this water tank was built indoors to service a local mall. Since March 1999, the structure shows no signs water dampness, leaks or seepage of any kind.
JFK PUMP STATION
Location:
JFK Airport, New York, USA
Date:
March 1999
Product:
KIM - Krystol Internal Membrane
Contractor:
Lotus Construction Co.
Ready-mix:
Seville Central Mix, Freeport, NY
Solution:
15" concrete walls and suspended roof slab were constructed with KIM concrete. To date, the pump house concrete is dusty dry and performing as specified.
Back to Top
|