|
||||||||||||||||||||||||||||||||||||||||
![]() |
||||||||||||||||||||||||||||||||||||||||
|
Toronto International Airport: Utility Tunnel BACKGROUND SOLUTION All cold joints were chislled to a depth of 38 mm and packed with the Krystol Crack Repair System, as per specificaton. Utilidor repair complete. Canadian Ministry of Transport waived normal 30-day payment holdback as the Krystol Crack Repair System far exceeded their expectations.
|
|
||||||||||||||||||||||||||||||||||||||
|
Home | Products | Solutions | Support | Projects | Distribution | About Us | Krystol® FAQ | Contact | News | Search | Site Map | Terms of Use | Privacy Policy |
||||||||||||||||||||||||||||||||||||||||