|
||||||||||||||||||||||||||||||||||||||||||||
![]() |
||||||||||||||||||||||||||||||||||||||||||||
|
Shanghai Subway BACKGROUND An effective waterproofing system and a watertight corrosion free concrete solution were needed to overcome these problems. The system had to provide cost effective quality and low cost maintenance while performing without membrane or coatings. SOLUTION Over 60mt of Krystol™ Technology went into the precast tunnel sections applied directly to the concrete mix. Even under the hydrostatic pressure of the Huangpu River KIM’s performance has already proven effective. An average of 5mt of the surface applied Krystol™ T1/T2 System was utilized in each station to effectively solve water passage and to provide effective protection to the reinforcing steel.
|
|
||||||||||||||||||||||||||||||||||||||||||
|
Home | Products | Solutions | Support | Projects | Distribution | About Us | Krystol® FAQ | Contact | News | Search | Site Map | Terms of Use | Privacy Policy |
||||||||||||||||||||||||||||||||||||||||||||