|
||||||||||||||||||||||||||||||||||||||||||||||||
![]() |
||||||||||||||||||||||||||||||||||||||||||||||||
|
Fire Vehicle Repair Facilty BACKGROUND Many details in the below grade concrete such as mechanics' trenches, hoist pits and sump pits proved to be difficult for conventional membrane installation. Also, poor soil conditions in high water table areas have a high silt content that retain 53% + moisture, which can swell and shrink causing stress on below grade structural components. SOLUTION Important to the success of the project is that contaminated water is kept from leaking in and/or out of the sump pits. To date, the structure is performing excellent. Subsequent construction has commenced next door, where engineers have required piles be driven into the poor soil conditions and basements are being avoided altogether.
|
|
||||||||||||||||||||||||||||||||||||||||||||||
|
Home | Products | Solutions | Support | Projects | Distribution | About Us | Krystol® FAQ | Contact | News | Search | Site Map | Terms of Use | Privacy Policy |
||||||||||||||||||||||||||||||||||||||||||||||||