Al Mashfa Private Hospital BACKGROUND SOLUTION The Krystol system employs advanced integral crystalline waterproofing technology to transform porous concrete into a permanent, water-resistant barrier and provides a guaranteed defense against water damage and steel reinforcement corrosion through constant head pressure. When combined with water and concrete, Krystol causes millions of needle-like crystals to grow and spread concrete particles to permanently block the movement of water and waterborne contaminants. If cracks form later on, incoming water causes additional crystals to grow, filling the cracks and ensuring that the structure’s waterproofing barrier is protected. Krystol technology provides maximum flexibility and can be used any time before, during or after the construction process. It can be applied in wet or dry conditions, and unlike external waterproofing membranes originally specified for the Al Mashfa Private Hospital, Krystol will not deteriorate – it is guaranteed to last the lifetime of the structure. “The implementation of all typical waterproofing methods would have been near impossible for our project,” said Mr. A. Hamis Elmas, Project Manager & Architectural Consultant, Al Mashfa Group. “Particularly given the challenges we incurred during excavation: the 12-metre (39.4 feet) cutoff wall and extreme head pressure. We required an advanced waterproofing system that could withstand all of these obstacles especially during the casting of the matt slab.” The Krystol Concrete Waterproofing System at the Al Mashfa Private Hospital included:
Predictably, when the team first turned off the dewatering pumps, water trickled in due to the intense head pressure. However, after a few weeks, Krystol’s crystalline technology self-sealed and left the structure dusty dry. “I can say with complete confidence that if Kryton had not been involved in this project, we would still be looking for a waterproofing solution that would meet the demands of our project. I will specify Kryton on all my future projects,” said Mr. A. Hamis Elmas, Project Manager & Architectural Consultant, Al Mashfa Group. More than 25,215kg (55,589 lb) of KIM-HS® treated 6,413 cubic metres (21,040 cubic feet) of concrete covering an area of 4,045.5 square metres (13,272.6 square feet). Over 551 lineal metres (1807.7 lineal feet) of KWS™ was used for all the cold joints. The Al Mashfa Group saved 48 days by employing the Kryton concrete waterproofing products.
|
|
||||||||||||||||||||||||||||||||||||||||||
|
Home | Products | Solutions | Support | Projects | Distribution | About Us | Krystol® FAQ | Contact | News | Search | Site Map | Terms of Use | Privacy Policy |
||||||||||||||||||||||||||||||||||||||||||||